3PH POWERFLOW

Beta
MULTICONDUCTOR TOOLS
Powerflow Analyzer
v1.0.2 08/08
Multiconductor
build 4643175
Ambient 32°C
Conductor 58°C
10/08/2028 | Wednesday
FEEDER MAP // — ISO VIEW · — BUSES · — BRANCHES
0.95–1.03 > 1.03 < 0.95 < 0.93
CONNECTING…
SOLVER
CLUSTER
ITERATIONS
—
TOLERANCE
—
MISMATCH
—
TIME
—
MAX ΔV / ITERlog10 pu
PHASE CURRENTS · A
L1—
L2—
L3—
IMAX —UNBAL —
SOLVER CCI-3PH idle
—
MAX ΔV (pu)
TOTAL P
—
LOSS %
—
BUSES
—
SLACK MW/MVAr
—
ΣLOSS L1/2/3
—
[XFMR-—]Loading—
[XFMR-—]Loading—
[XFMR-—]Loading—
PRIMARY —LATERAL —SERVICE —LOSS —
DIAGNOSTIC CONSOLE // LATEST ANALYSIS

Power Flow Results

Element-level multiconductor output and controller operation audit.

CIRCUIT — NO SOLVE
NOT REFRESHED
TABLES—
TOTAL ROWS—
CONTROL OPS—
ACTIVE SOURCE—
STATUSWAITING FOR SOLVE
RESULT DATA // 000

No completed solve

Run power flow from Home to populate calculated element results and controller-operation telemetry.

Values captured from the latest completed analysis. GENERATED —

3PH Powerflow

Network Diagnostics

Circuit
CKT-218-14401
Buses / Branches
14 / 13
ConnectedConvergedLive
LEFT
SOURCE SUBSTATIONMODEL LOADEDPORT MAPPER / 11218-14401
.95-1.03>1.03<.95<.93
FEEDER MAP // CKT-218-14401SCHEMATIC · 14 BUSES · 11 BRANCHES
RIGHT
1.0501.0251.000.975.950SUB0.9 km1.9 km2.8 km.95 LIMIT
Ph APh B/CLoading
VOLTAGE PROFILE // PU3-PHASE · ALONG FEEDER

[▣] Solver

· Cluster
CCI-3PH
Iterations
7 × 3 CS
Tolerance
1.0e-6 pu
Mismatch
4.1e-7
Time
412.0 ms

[▣] Max ΔV / iter

· log10 pu

1   2   3   4   5   6   7

[▣] Mismatch

· converged
4.1e-7

Max ΔV (pu)

Total P
4.820 MW
Loss %
3.69 %
Slack MW/MVAr
4.82 / 1.63
ΣLoss L1/2/3
64/53/61 kW

Diagnostic Recommendations

0 selectable
UsePriorityIssue typeRecommendation
RUN DIAGNOSTICS TO GENERATE TARGETED RECOMMENDATIONS.
Run multiconductor checks against the active network.

Diagnostic Issues

0 found
CodeCategorySeverityCheckElementPhaseEvidence
NO DIAGNOSTIC ISSUES YET.

Diagnostic Results

SeverityCount
Critical-
High-
Medium-
Low-